Epic Bike Fest

Miles upon miles of pristine CAMBA singletrack define the Epic singletrack racecourse.  The challenge will require riders to surf through smooth banked turns, traverse rock gardens, and navigate through twisting turns for 34 memorable miles. Racers will start at Hatchery Creek Park near Hayward and finish at the Mt. Telemark Village in Cable, Wisconsin. An …

RASTA RALLY Mountain Bike Race

Get in on the action. This is a family friendly mountain bike race and traditionally the first race of the year in northern Wisconsin and the great U.P. of Michigan.  The RASTA Rally will use the Washburn Trail system which offers 13 miles of challenging single track, bridges, rock gardens, fast and fun flow trails, …

Wausau 24

Wausau 24 is the largest 24 hour mountain bike race in the mid-west.  The marquee race features a 13 mile course of cross-country single track, machine-built flow and ski trails through Nine Mile County Forest near Wausau, WI. Competitors race in a 6, 12 or 24 hour category, solo or on teams to complete as …

InSayner

The InSayner takes place in the depths of Northern Wisconsin’s beautiful Northern Highland American Legion State Forest and there are 2 routes available to racers. Choice Number 1 (and highly recommended), the brutal 23 mile backwoods biking adventure: Ride snowmobile trails, sweet stretches of downhills, an old ski hill run, logging roads, gravel roads, a small stretch …

IRONBULL Red Granite Grinder

144-mile, 85-mile, and 50-mile gravel bike races through Marathon County including rolling gravel roads, ATV trails, beautiful parks, forests, ginseng fields, and farm lands. 12-mile recreational ride free for kids

Dam Trails at Alliant Energy

There are between 3 and 3.5 miles of trail built out; a nice mix of fast-drying sand and interesting terrain, with more being built all the time. Check out https://www.madcitydirt.com/index.php?topic=4304.0

Willow River State Park

First 3.5 miles open October 9, 2021. Supported in part by Willow Kinni Mountain Bike Club. Up to 25 miles of trail planned to be constructed over the next three years.