Level: 
					Length: 3.1 mi (5 km)
				 
				
					Surface: Singletrack
					Configuration: Loop
				 
				
					Elevation: -
					Total: 0 riders
				 
				 
			 
			Mountain Biking Dam Builders Trail
			
			
			
			
				#195 of 205 mountain bike trails in Tennessee
				
			 
		
			From TVA.com:
Dam Builders trail is built on land that was excavated for materials to build the earthen South Holston Dam.
			First added by Jeff Barber on Jun 15, 2020. Last updated Jun 15, 2020. → add an update 
			Before you go
			
			- Drinking water: unknown
- Lift service: unknown
- Night riding: unknown
- Pump track: unknown
- Restrooms: unknown
- Fat bike grooming: unknown
- E-bikes allowed: unknown
- Fee required: unknown
This trail information is user-generated. Help improve this information by suggesting a correction. 
			
						Take highway 421 south from Bristol to South Holston Dam road. 36.536337, -82.106587