As of June 2025, the 1.5 miles of singletrack that have been completed include a green XC loop, a green climb trail to the upper hub, and a blue downhill flow trail departing from the upper hub. In addition, the short connector to the airport has already been built.
Phase two, which is currently under construction, will add a green downhill flow trail and a connector around the south end of the airport. While the two-mile distance is currently small, the jump lines will allow riders to rip entertaining laps even in a condensed area.
Future developments have already been mapped out as well and are awaiting funding. "There’ll be a pretty gnarly North Shore [section] between the rocks," said Gannon. A planned skills park will also add a slew of features to play on.
According to Gannon, the phase three concept would double the available mileage in the network.